Project Overview
The Gulf Coast Pipeline Corridor is a 200-kilometre high-pressure natural gas and NGL pipeline system connecting Eagle Ford Shale producers to Corpus Christi LNG and export terminal infrastructure. Corevale Group managed the full project lifecycle — from route selection and FERC permitting through construction, hydrostatic testing, and commissioning — delivering the corridor on schedule and under budget. The pipeline includes SCADA-integrated leak detection, cathodic protection, and four compressor stations, and is now operating at full capacity serving six producer clients.
Timeline:
2023 - 2024
Project Details
Oil & Gas
Operational
2023 - 2024
Corpus Christi, TX
Project Objectives
Strategic goals driving this initiative forward
Design and construct a 200km high-pressure pipeline corridor
Achieve regulatory approval within a 6-month permitting window
Commission all four compressor stations on schedule
Deliver zero environmental incidents during construction
Key Features
Innovative technologies and capabilities powering this project
200km of 24-inch high-pressure pipeline
SCADA-integrated real-time leak detection
Four compressor stations along the corridor
Full cathodic protection system
Hydrostatic pressure testing to 1.25× MAOP
DOT/PHMSA compliant integrity management programme
Project Impact
Measurable outcomes and benefits delivered
200km of new pipeline infrastructure delivered
6 Eagle Ford producers connected to export markets
Zero environmental incidents during 14-month construction
Full capacity operations achieved 3 weeks ahead of schedule
$180M infrastructure investment supporting regional energy exports