
Project Overview
The Wyoming Basin Well Services Campaign was a 24-month, multi-field workover and production optimisation programme covering 50+ wells across the Powder River and Wind River Basins. Corevale Group mobilised two workover rigs and a coiled tubing unit from our Casper, WY facility, executing tubular replacements, artificial lift conversions, hydraulic fracturing restimulations, and plug-and-abandonment operations. The campaign delivered a 28% average production uplift across treated wells and successfully abandoned 12 legacy wells to Wyoming Oil & Gas Conservation Commission standards.
Timeline:
2023 - 2024
Project Details
Oil & Gas
Completed
2023 - 2024
Casper, WY
Project Objectives
Strategic goals driving this initiative forward
Restore and optimise production across 50+ mature wells
Execute P&A operations on 12 legacy wells to WOGCC standard
Reduce average lifting cost per BOE by 20%
Maintain zero lost-time incidents across the campaign
Key Features
Innovative technologies and capabilities powering this project
Two workover rigs (150,000 lb hook load) deployed from Casper base
Coiled tubing unit for stimulation and wellbore cleanouts
ESP and rod pump artificial lift conversions
Hydraulic fracturing restimulation of 18 wells
Full P&A operations on 12 legacy wellbores
Production logging before and after each intervention
Project Impact
Measurable outcomes and benefits delivered
28% average production uplift across treated wells
12 legacy wells safely abandoned to regulatory standard
20% reduction in average lifting cost per BOE
Zero lost-time incidents over 24-month campaign
50+ wells serviced across two major Wyoming basins